System equipment carrier

System equipment carrier 240 - 310 mm

System equipment carrier 240 - 310 mm
Preview: System equipment carrier 240 - 310 mm
System equipment carrier 240 - 310 mm
  • 9966.32
  • 7611614269627
  • Adaptation to insulation thickness possible in 10 mm steps
  • including 2 screw dowels
  • Material: Polyethylene
  • Insulation material: Neopor
  • Processing temperature: - 5 °C / + 60 °C
Length
220 mm
Width
110 mm
Height
240-310 mm
Combination conduit entries M20/25
2
Combination
1x1 / 2x1 / 3x1
Screw-in wall-plug
1 x 280 mm, 1 x 320 mm
Halogen-free
Yes
Dispatch
5

System equipment carrier

The system equipment carrier is designed to fit perfectly into the external insulation and in this way reliably prevents heat bridges. Easy, fast fixing with the screw dowles included in the scope of delivery permanently anchors the system equipment carrier on many surfaces. Ideal for stable fixing of external lamps, sockets, door intercom devices and many more. nd permanently. Heavy loads are not a problem.

  • Extra-fast, easy installation
  • 2 product types allow a wide range of applications
  • Heat bridges are efficiently prevented
  • Adaptable to insulation thickness in 10 mm steps – no cutting necessary
  • Modular design for insulation thicknesses from 160 to 310 mm

Examples of use

Versatile in use

The choice of two front parts and the modular design make the system equipment carrier a product which is extremely versatile in use. Cutting to size is not necessary because of adaptation to the insulation in 10 mm steps. Fixing by means of a single impact dowel reduces fitting time to a minimum, and at the same time it ensures secure anchoring to the base, e.g. masonry, concrete or wood materials.

1 Basic element | 2 Intermediate elements | 3 Housing base | 4 Front plate | 5 Screw-in wall-plug

Weight-bearing loads

1 Weight-bearing loads – independently of the insulation thickness: For an overhang of 160 mm and insulation thicknesses of 160 - 310 mm; 8 kg without additional screwing of the front plate; 10 kg with additional screwing of the front plate. The system equipment carrier must be fitted vertically. The hole for the dowel must be drilled to make an exact fit. | 2 Increasing the weight-bearing loads: To fix heavier loads, we recommend additional securing of the mounting plate by means of four Ø 3.5 x 25 screws

Heat bridge calculation

A heat bridge calculation carried out by the Passivhaus Institut in Darmstadt shows that the system equipment carrier has a point-specific heat bridge loss coefficient of xWB < 0,01 W/K and meets the requirements of a heat bridge-free facade.

Installation

Masonry with conduit Exit.

Adapt equipment carrier to insulation thickness by selecting suitable components.

Cut Ø 8 mm drill hole at least 50 mm deep.

Remove the side lugs from the screw dowel. Note the different lengths!

The dowel screw must protrude from the basic element by at least 40 mm.

Hold the equipment carrier against the wall, align it, and fix it using the dowel.

Press the conduit into the side guide and cut it to length.

Snap on the required front part. Fit Styrofoam cap and the dowel cover.

Tips and tricks

For an additional conduit, remove the bridges next to the Neopor® parts...

…and the perforated entry broken out in the case of the dowel cover.

For air-tight installation, fit a suitable air-tight sleeve to the conduit exit site...

…and fit a sealing plug to the conduit.

Combinations with front panels

Multiple accessories front panel (Art. Nos. 9966.31 and 9966.32); opening Ø 1 x 68 mm.

2-way and 3-way combinations can be made by breaking out the covers.

Delivery status of (Art. Nos. 9966.21 and 9966.22), universal mounting plate.

Universal mounting plate with broken-out exit for luminaires.

Certificate

RoHS and REACH Regulation

465 KB

Select download
Certificate

System-Geräteräger - Wärmebrückenberechnung

Product data sheet

System equipment carrier 240 - 310 mm

Order number: 9966.32

Download
Flyer

System equipment carrier

Heat bridge-free electrical installation in insulated facades.

2.2 MB | 2018-02-02